November 18, 2019 Uncategorized More than 400 Namibians are expected to be employed when the second phase of the road construction between Windhoek and the Hosea Kutako International Aiport starts. This was revealed by the Minister of Works and Transport John Mutorwa. November 18, 2019Author: Category: Uncategorized Share: